主页 海港概况 投资环境 产业导向 投资政策 投资流程 配套服务 信息中心
 
自然环境
基础设施
人才资源
各类费用
投资环境

基础设施

  • Roadway establishment

      Chessboard network roadway system, the wide of road is 36 meters and 24 meters. The main roadway communicate to Expressway (A30, A2, B2).

  • Electric power establishment

      Power supplied by east-China electricity net, can provide all kinds of level such as 10KV, 35KV, and 110KV. The total electric power capacity is about 330,000KVA.

  • Water supply establishment

      Water directly provided by piped water factory, 250,000Tons/Day. The water pressure is above 1.6kg.

  • Sewage disposal

      One sewage disposal factory of 100,000 tons capacity.

  • Drainage establishment

      The drainage net is meet to the red construction line of all factory to ensure drain of water when it rains continuously.

  • Gas:

      The capacity is arrived to 100,000cubic meter/day, with 1kg/square centimeter exit pressure.

      Shanghai Seaport Comprehensivw Economic Development Zone will focus on independent talent cultivation, cooperate with universities, scientific research units and relevant foreign organs on talent and technology development, enhance its attraction to talents, and make the Zone become a highly attractive talent carrier.