- Roadway establishment
Chessboard network roadway system, the wide of road is 36 meters and 24 meters. The main roadway communicate to Expressway (A30, A2, B2).
- Electric power establishment
Power supplied by east-China electricity net, can provide all kinds of level such as 10KV, 35KV, and 110KV. The total electric power capacity is about 330,000KVA.
- Water supply establishment
Water directly provided by piped water factory, 250,000Tons/Day. The water pressure is above 1.6kg.
- Sewage disposal
One sewage disposal factory of 100,000 tons capacity.
- Drainage establishment
The drainage net is meet to the red construction line of all factory to ensure drain of water when it rains continuously.
- Gas:
The capacity is arrived to 100,000cubic meter/day, with 1kg/square centimeter exit pressure.
Shanghai Seaport Comprehensivw Economic Development Zone will focus on independent talent cultivation, cooperate with universities, scientific research units and relevant foreign organs on talent and technology development, enhance its attraction to talents, and make the Zone become a highly attractive talent carrier.
|
|
|